If you are going to build a new home or any other structure you need to know latest construction material rate in Pakistan 2024. We will share price list of building material with you on this page. Through this price information page you can calculate total cost for construction of a building. The rate of building material is increasing day by day. Due to the depreciation of the Pakistani rupee against the dollar, the purchase of raw materials has increased.
Construction Material Rate in Pakistan Today [datetoday]
Construction Material Type | Price Unit | Rates in PKR (Minimum to maximum) |
---|
Cement (Check all Cement Companies Prices here) | Per Bag | Rs. 1,240 to 1,290 |
Bricks | Per Brick | Rs. 12 to 16 |
Steel – Iron Bar – سریے کے ریٹس چیک کریں | Per KG | Rs. 240 to 260 |
Sand | Cubic Feet / Trolley | Rs. 14,000 to 25,000 (as per quality) |
Crush (Bajri) | Per Cubic Feet | Rs. 50 to 80 |
Aluminum Windows – Check Windows prices here | Per Square feet | Rs. 1,100 to 1550 |
Tiles | Per Square Meter | Rs. 900 to 2,000 (as per quality and brand) |
Doors (Plywood) | Per Square feet | Rs. 400 to 800 |
Marble – See All Marble prices here | Per Square feet | Rs. 60 to 120 (as per quality and marble category) |
Iron Chokhat for Doors | Per Square feet with labour | Rs. 300 to 520 |
Main iron gate | Running feet (or total weight in KG) | Rs. 60,000 to 180,000 |
Labour rate | Covered area Per square feet | Rs. 300 to 450 |
Item wise building material rates are as given above. These prices are approximate and include rates of major brands only for your understanding.
Besides above materials other include sanitary fittings, paint, electrical wiring and boards, sewerage pipes, water tank, tuff tile etc. These rate of bulding material may vary with respect to major cities like Lahore, Gujranwala, Multan, Faisalabad, Islamabad, Rawalpindi, Karachi, Hyderabad and Sukkur etc. if we compare rates with respect to provinces of Punjab, SIndh, KPK, Baluchistan and Azad Kashmir rates will be different because of transportation cost.
Check: Petrol, Diesel & Kerosene Oil Prices Today
Construction Labour rate in Pakistan:
After you have calculated the material cost now its time to calculate the labour cost. Labour is charged in Pakistan as per square feet of covered area. Current rate of labour rate is Rs. 25o to 380 per square feet of covered area. This rate will depend on the construction area and design. labour rates are high in big cities while it may be lower in small cities of Pakistan.
Cost of 3, 5 or 10 marla house in Pakistan in 2024 can be calculated as per above given construction material rate easily.
Kindly Sir,
bata sakty hain agr without matrial labour rate pa kam kia jay to kia rate hony chiya.
1-Foundation per sq.ft
2-Ground floor structure with plaster.
thumb up, Very Helpful information and General overview for a lay man like me, thanks and keep your it up.
Very helpful information, i am interested in marble is there someone so i can place an order for marble?